Search Posts:

Latest Projects:

CBM 2001-16B (PET)

by billdeg
Total messages in this thread: 1
Commodore PET 2001-16B upgraded with 16K more RAM and a SM-KIT programmer's productivity kit ROM. Donation to Kennett Classic by Alan Walter. Click image for larger view.
Not CBM-branded but this is the Livermore Labs Star 488 IEEE Modem and software that was OEM'd as the CBM 8010 IEEE modem. Click image for larger view.
A nice copy of PET Microchess. Click image for larger view.
Click for more photos NEXT:">... [ read more ]

Relay Moe Plays Tic Tac Toe 1956

by billdeg
Total messages in this thread: 1
Relay Moe is an early electronic game programmed to play Tic Tac Toe, 1956, article by computing pioneer Edmund C. Berkeley
A scan of one of the Radio Electronics magazine covers on site at Kennett Classic in Kennett Square, PA.">... [ read more ]

setting reply-to VMS Mail with MULTINET

by billdeg
Total messages in this thread: 2
Updated: [ Permanently set MULTINET_SMTP_REPLY_TO ] 10/03/2019
Introduction to VAX/VMS Manual Cover
Cover of the Introduction to VAX/VMS Manual 1987
Peter Coughlin writes: "... Specifying the REPLY_TO Header The MULTINET_SMTP_REPLY_TO logical name lets you specify the value for the RFC822 REPLY-TO: header. For example to set your Reply-To: header to FNORD@FLOWERS.COM, use the command: $ DEFINE MULTINET_SMTP_REPLY_TO "FNORD@FLOWERS.COM" This logical name only affects mail agents that use the SMTP% interface (for example OpenVMS and DECWindows mail). Endquote. In case it is not clear, you should define this logical name in DCL before you run VMS MAIL and it will then apply when you send mail to an address prefixed by SMTP%. I will add that you could probably use DEFINE /SYSTEM if you want this to apply to all users on the system or you coul">... [ read more ]

1966 GE/Pac 4000 Small Process Computer

by billdeg
Total messages in this thread: 1
The General ELectric Process Automation Computer - GE/Pac 4000. Click image for larger view.
Download Product Brochure">... [ read more ]

PDP 11/40 M7234 TIMING CPU Card Fail

by billdeg
Total messages in this thread: 1
PDP 11/40 TIMING module DEC 5380 SN20628N 2-input NOR removed
Closeup of a PDP 11/40 TIMING controller card, M7234 where a Dual NOR DEC 5380 SN20628N 2-input NOR chip has been removed. It caught fire. A replacement chip was pulled from donor M7234 and the card appears to be working correctly again. Click image for larger view.
Full disclosure - I accidentally plugged the M7234 into the wrong UNIBUS CPU backplane slot, ug. Too much juice to the chip fried it. Using three sets of 11/40 CPU controller cards I had been swapping cards around in the effort to get an EIS CPU card (M7238) running. The EIS is necessary to boot UNIX but I have been unsuccessful in finding a working set of">... [ read more ]

Iowa State 1957 IBM 650, Cyclone 1

by billdeg
Total messages in this thread: 1
Iowa State College Progress report No 1
Iowa State rented an IBM 650 and went live in February 1957. The implementation team published a report on their progress, lead by T. A. Bancroft Director, Statistical Laboratory; Chairman, Working Committee for the Improvement of Computational Facilities at Iowa State College
"...After much careful study, an interdepartmental "Working Committee for Improvement of Computational Facilities at Iowa State College" recom­mended, early in 1956, both the rental of an IBM 650 at a 60% educational discount and the construction of a digital computer for which the llliac at the University of Illinois would serve as prototype. The IBM 650 was in­stalled on February 7, 1957 and has now been in continuous service for over two years. Construction of the Cyclone, ISC'">... [ read more ]

Cromemco System Three Revisited

by billdeg
Total messages in this thread: 1
Cromemco System 3 Three Disk Drive Interface Controller
Pictured is the drive signal/power interface board installed in the chassis of the Cromemco System Three. This board is used to route power to the Persci 299 twin 8" drives, and I believe the drive controller signals. Visually inspect the board. Can you guess what's wrong with this picture? Click image for larger view.
Cromemco System 3 Three Disk Drive Interface Controller 2000uf cap
This photo does a better job to display the problem, the 2000uf 50v cap has blown">... [ read more ]

PDP-11 Still Going Strong

by billdeg
Total messages in this thread: 1
DEC PROFESSIONAL Letter to Editor PDP-11 Still Going Strong
From the Letters section of an un-dated clipping, DEC PROFESSIONAL magazine Spring House, PA. Click image to download PDF
This short letter offers an interesting perspective of the DEC Professional in the late 1980's. Being that many DEC machines are still functional today it would be very believable that a person would choose to continue to use their UNIBUS system, especially an 11/44 into the 1990's. If I was to guess I'd say this letter was published in early 1987.">... [ read more ]

Vintage Computer Festival East 2019

by billdeg
Total messages in this thread: 1
This humble author's biased pick for best in show, the LNW80 / Lobo Max80 exhibit with spokesmodel, Karen. Click image for more exhibit photos.
Fun event highlighted by Saturday keynote presenters Unix co-inventor Ken Thompson interviewed on stage by Brian Kernighan and Sunday keynote by Atari/Amiga engineer Joe Decuir. ">... [ read more ]

LNW80 Microcomputer Restoration

by billdeg
Total messages in this thread: 1
LNW 80 Microcomputer
The LNW80 computer is a Radio Shack TRS 80 Model 1 clone, more or less. The BASIC is different and the memory map is different. Any programs that rely on either of these things will not operate properly, but DOS PLUS and NEW DOS for the Model I is easily adapted for the LNW80. The photo above displays the opening panel of the Modular Software Associates LNW BASIC Demo. LNW BASIC has commands that employ the LNW80's color display capabilities. Click image for larger view.
LNW 80
With the chassis cover removed, this image reveals a twin control board configuration. On top is the System Ex">... [ read more ]

CDC 6600 Cordwood Logic Modules

by billdeg
Total messages in this thread: 1
CDC 6600 cordwood logic moudle
Pictured are Control Data Corporation 6600 modules. The sandwich-shaped device on the left is called a "cordwood logic module". Each of these contain 64 silicon transistors. The board to the right has the same bus/pin configuration and is likely also from a 6600 or an early "Cyber series" computer, a system based on the 6600. Click image for larger view.
The The Control Data 6600 was considered by many to be the first super computer. More photos">... [ read more ]

~1960 Burroughs Logic Module 72477T

by billdeg
Total messages in this thread: 1
~1960 Burroughs Logic Module 72477T Click image for larger view.
Rear view, same. Click image for larger view.
The Computer History Museum has a similar item, their description reads: "Each module holds eight components: 2 resistors and 6 diodes, mounted on a phenolic frame with two separate common contacts + eight individual contacts." Looking through Burroughs computer and peripheral manuals I have for early 1960's hardware, I cannot say for sure which system the 72477T came from because there are no photos or diagrams">... [ read more ]

My Computer Likes Me when I speak BASIC

by billdeg
Total messages in this thread: 1
The front cover of My Computer Likes Me when i speak BASIC by Bob Albrecht publshed by DYMAX circa 1971-1972. This softcover book was intended to teach BASIC programming to students and persons previously unfamiliar with computers. Students would use this book in a classroom environment in front of a Teletype attached to a mini computer running BASIC.
Here is an example of a lesson, titled "the problem" whose purpose was to demonstrate how the same problem can be solved multiple ways. Click image for larger view.
... [ read more ]

GRiD Compass II Model 1219

by billdeg
Total messages in this thread: 1
Another of Hillary's lost laptops? Obviously this laptop pre-dates the former First Lady's stint with the State Department, but I can only wonder who might have used it. This Compass II 1219 powered up with custom BIOS ROM. Click image for larger view.
Along with this 1219 I picked up a GRiDCASE More GRiD photos">... [ read more ]

DEC PC05 High-speed Tape Reader

by billdeg
Total messages in this thread: 1
Front view of the DEC PC05 high-speed papertape reader. Click image for larger view.
Rear view of same DEC PC05 high-speed papertape reader, where one can see the reader was paired with a PDP 11 system (inset closeup). Click image for larger view.
NEXT - Find the pr11 controller (M7810). Because this is a reader only, it may be possible to use a serial card instead, like a M7800, or with minor modifications.">... [ read more ]
OLDER POSTS (15 threads per page): 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |

Resources:


Buy a Commodore Computer Poster

Popular Topics and FAQs


  • TM990/101 M
  • Altair 8800bt notes
  • TRS 80 Model 4 Engineering Sample
  • Altos 5-5AD
  • Morrow Wunderbuss Motherboard - Fried!
  • Epson PX-8
  • C64 emulator to run on PC
  • Mac 128K with SAD MAC error 041800
  • IMSAI 8080 With Processor Tech. Cutter
  • Secrecy is the keystone of all tyranny
  • Cromemco System Three
  • Commodore "Coherent"
  • Exatron Stringy Floppy Update
  • TM 990/189 or PP189
  • Lanier Word Processor Model 103
  • Univac 1219 rescue
  • IMSAI 1.4 BASIC vs. MITS 8K BASIC
  • Atari 520ST
  • DEC Information Request Reply Card
  • Amiga 2500 Restoration
  • IBM XT sn 4359455
  • Amiga 2000 with Dual Drives and HD
  • A New 68000 CPU S-100 Board
  • Edmund Scientific Co Ad 1973
  • Micropolis 10xx Drive Inventory
  • Texas Instruments 99/4a with PHP1200
  • MITS Altair 8800b T with Dual Drives
  • Burroughs L5000 Controller Card Photos
  • Digital PDP 11/44
  • TRS 80 Model III Exatron Stringy Floppy
  • Digital PDP-9 The Serious Computer
  • Live long and prosper, Spock
  • PDP 11/40 M7656 Serial Comms
  • 1993 Compaq Deskpro 5/60M
  • 1974/5 TCC-3700 i8080 Computer
  • Processor Tech 3P + S ASR 33 Jumpers
  • Tektronix 4015-1 Graphics Terminal
  • Lear Siegler ADM-3A GraFix Board
  • UNIVAC 1219 USS Midway CV-41
  • Commodore VIC-21
  • Prevent VMS MULTINET SMTP Relay Hijacks
  • NExT Cube Restoration
  • 1976 P.C.C. Features the MAI JOLT 6502
  • 1961 Beckman DEXTIR Computer
  • UNIVAC 1 and UNIVAC File Computer 1
  • Computer Music Using the IBM 7094
  • 1985 PCs Limited Turbo PC
  • Digital Equipment Corporation PDP-8
  • IMSAI 8080 Chase the Lights Variations
  • XYBASIC on the IMSAI 8080
  • Cromemco Dazzler
  • Cramer Intel 8080A Microcomputer
  • Original ACHTUNG Computer Lab Humor
  • Leading Edge Computers
  • Past Issues:


    vcfse 5 Koblentz Lego Expansion Interface

    This image was selected at random from the archive. Click image for more photos and files from this set.